The Rukarara VI Hydropower Plant is a 9.76 MW run-of-river project located in the Nyamagabe District of Rwanda’s Southern Province, developed by Prime Energy Plc. The project aims to increase renewable energy access as part of Rwanda’s 100% electrification target, with construction beginning in 2021.
Signitive Engineering was involved in design and Boq preparation for the project.
Project Scope and Participants
- Project Name: Rukarara VI Hydropower Project
- Capacity: 9.76 Megawatts (MW)
- Location: Nyamagabe District, Rwanda
- Developer: Prime Energy Ltd (now Prime Energy Plc)
- EPC Contractor: VS Hydro Ltd
- Electromechanical Installation: Gugler Austria (supply and installation)
- Owner’s Engineer: EXP Canada
Project Scope and Participants
- Project Name: Rukarara VI Hydropower Project
- Capacity: 9.76 Megawatts (MW)
- Location: Nyamagabe District, Rwanda
- Developer: Prime Energy Ltd (now Prime Energy Plc)
- EPC Contractor: VS Hydro Ltd
- Electromechanical Installation: Gugler Austria (supply and installation)
- Owner’s Engineer: EXP Canada